
TRAIN LOAD PLANNING & WAGON CHECK
Plan every load to the wagon. Check every wagon out.
Auto-allocate units to wagons, run rail plan-checks on every load, and check each wagon out before departure, load planning and wagon-level compliance a pure container TOS cannot do.

CAPABILITIES
Load planning to the wagon, wagon check and composition, and rail fleet visibility, because TOS runs on the same platform as Rail-Flow’s TMS and Fleet.
Wagon check
Check every wagon out before departure.
Incoming trains are inspected - wagon numbers, positions, and timestamps recorded - and wagon sequences managed as composition. Weight, axle, length and profile are validated at loading and gate-out, and a wagon-master security checkout confirms the train is safe to run. The final composition, with its CIM waybill, is sent to the arrival terminal and the train departs on record.
Wagon number, position, and timestamps captured on arrival.
Wagon-master checkout [roadmap]
Security checkout confirms the train is safe before it runs.
Final sequence and waybill sent to the arrival terminal on departure.

LOAD PLANNING & WAGON CHECK
Get a personalised walkthrough of load planning and wagon check for your trains.
Everything you need to know about train load planning and wagon check. Anything missing? Just ask during your demo.
Have a question that's not covered here? Reach out and we'll get back to you within one business day.

Most terminal operating systems manage the yard and gate but not the train. Rail-Flow plans loads to the wagon, runs wagon-level compliance, and checks wagons out, because TOS shares one platform with our rail TMS and Fleet.
Automatically, ranked by penalty so the best fit is proposed and adjustable by the planner. Train composition is known ahead from EDI, so wagons and units are set before the train arrives.
Weight, axle, length and profile at loading and gate-out, plus capacity, dangerous goods, out-of-gauge, allowed units, and holds. A wagon-master security checkout confirms the train is safe to run.
Yes. Wagon sequences are managed as composition, and the final composition with its CIM waybill is sent to the arrival terminal when the train departs. [Confirm live vs. Phase 1 roadmap.]
Live GPS position, speed and ETA per wagon, wagon fleet and leasing data (VTG, GATX, Wascosa, Ermewa), wagon masters, and maintenance and SLA dates, from the same Rail-Flow platform
MORE FROM TERMINAL OPERATIONS
Discover other capabilities of the Terminal Operating System that work alongside train load planning and wagon check.

Yard Placement & Move Jobs
The moves and unit-to-wagon allocations the yard produces feed straight into the train load plan.

Truck Check-In & Check-Out
Units enter at the gate and become the pool the load plan draws from, validated, photographed, and placed.

Wagon Fleet & Tracking
Track position, ETA, maintenance, damages, and leasing across your wagon fleet on the same Rail-Flow platform.